Step 1
FOUNDATION SLAB
Pour 10 cm thick concrete template reinforced with electro-welded mesh.
-
Level the ground.
-
Compact with tepetate.
-
Place polypropylene as insulation.
-
Place electro-welded mesh.
-
Prepare sanitary facilities.
-
Strain and cure.
Note: The foundation may change based on the specific project.
